Grooming Building
In the summer of 2001 we had a grooming building built.  Here are a few shots it being built and a few other misc shots.

Click on photo to enlarge


I originally had my runs on this cement pad covered by a lean-to structure.  The building was put up around the pad.  Here they are just starting to measure and mark the location of the walls.

The posts were put up surrounding the existing slab.

A separate pad was poured for an attached porch on the west side of the building.

Beginning to hang metal.  Dog doors were built into one side.

I put the fencing up to the sides.

Finished exterior view 1.  I have added Indoor/outdoor runs.

Finished exterior view 2.

Finished exterior view 3.

Finished exterior view 4.  They ran electricity out to the building and installed the A/C unit I bought.

Finished exterior view 5.

They put up the weather vane I bought one year at the National.

I finished the interior.  Each run (there are just two) has access to a fenced yard.

Finished interior view 2.  I left a gap between the wall and slab for drainage.

Finished exterior view 6.  The following spring.

Finished exterior view 7. The following spring.

Bluebonnet patch behind my old barn.

My flag pole.

Will this roll never run out?

Return to Home Page