I originally had my runs on this cement pad covered by a lean-to structure.
The building was put up around the pad. Here they are just starting
to measure and mark the location of the walls.
|
The posts were put up surrounding the existing slab.
|
 |
 |
A separate pad was poured for an attached porch on the west side of
the building. |
Beginning to hang metal. Dog doors were built into one side. |
 |
 |
I put the fencing up to the sides. |
Finished exterior view 1. I have added Indoor/outdoor runs. |
Finished exterior view 2. |
Finished exterior view 3. |
Finished exterior view 4. They ran electricity out to the building
and installed the A/C unit I bought. |
Finished exterior view 5. |
They put up the weather vane I bought one year at the National. |
I finished the interior. Each run (there are just two) has access
to a fenced yard. |
Finished interior view 2. I left a gap between the wall and slab
for drainage. |
Finished exterior view 6. The following spring. |
Finished exterior view 7. The following spring. |
Bluebonnet patch behind my old barn. |
 |
My flag pole. |
 |
Will this roll never run out? |